Check Kingston’s wastewater permit and LCA pathway for an unsewered property, including the information needed before requesting a quotation.
View our Land Capability Assessment serviceCheck sewer servicing before planning an onsite system
Confirm the servicing position for the exact address. An asset map is an initial reference and does not prove that sewer connection is available or that council will accept an onsite system.
Confirm which assessment the proposal needs
Kingston’s linked application form includes questions about slope, an LCA and a site-specific system design for smaller lots. An LCA is also listed among the possible supporting documents, without the mandatory marker used for some other plans and reports.
Do not assume that every lot below 1,000 m² must have an LCA, or that a larger lot is exempt. Ask council to confirm the wastewater and planning requirements for the actual proposal.
Keep the site assessment and system design coordinated
Provide the current site and floor plans, intended use and any existing wastewater approvals. The LCA considers site capability and land available for effluent dispersal or recycling. Detailed system design and installation documents have separate roles in the permit process.
Council’s linked application contains older administrative information. Obtain the current application and fee advice before lodging, and use current Environment Protection Authority (EPA) guidance for the technical assessment.
What to send for a quotation
- Property address and sewer-servicing advice
- Current site plan and floor plans
- Proposed use, bedrooms or occupancy
- Council planning or Environmental Health correspondence
- Existing onsite wastewater approvals and earlier reports
Send the information you have. We can identify any additional information needed to prepare your quotation.
Frequently asked questions
Does Kingston require an LCA for every unsewered property?
Confirm the LCA requirement with council for the property and proposed works. Lot area alone should not be used to decide whether an assessment is needed.
Does the 1,000 m² reference decide whether an LCA is needed?
No. The form includes smaller-lot questions, but that is not a blanket LCA rule or an exemption for larger lots.
What should I send for a quotation?
Send the address, servicing advice, current plans, proposed use and any council correspondence or existing wastewater records.
Is an LCA the permission to install a system?
No. Council separately assesses the permit application and the proposed system. The LCA supports that assessment where required.
Official resources
Kingston septics and greywater
Council’s wastewater information and access to its application form.
View Kingston septics and greywaterKingston install or alter application
Supporting-information checklist; confirm current administrative requirements with Council.
View Kingston install or alter application (PDF)EPA onsite wastewater guidance
Current statewide assessment and permit guidance, used alongside Council advice and applicable planning requirements.
View EPA onsite wastewater guidanceBoundary: © State of Victoria (Department of Transport and Planning), Vicmap Admin. CC BY 4.0. Simplified for display. Catalogue updated 5 September 2026; retrieved 12 September 2026.
Council requirements last reviewed: 12 September 2026
Yarra Geotechnics is an independent consultancy and is not affiliated with or endorsed by Kingston City Council. Council determines the final application and permit requirements.
Need a Land Capability Assessment for a Kingston application?
Send the property address, current plans and any council correspondence. Yarra Geotechnics reviews the property and proposal before setting out the project-specific scope, fee and deliverables in the quotation.
